Upper Tamakoshi Hydroelectric Project
Upper Tamakoshi Hydroelectric Project | |
---|---|
Location of Upper Tamakoshi Hydroelectric Project in Nepal
|
|
Country | Nepal |
Location | Gaurishankar Conservation Area, Dolakha District |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Purpose | Hydroelectricity |
Status | Under construction |
Construction began | 2011 |
Opening date | Mid 2016 |
Owner(s) | Upper Tamakoshi Hydropower Limited |
Dam and spillways | |
Type of dam | Run-of-river |
Impounds | Tamakoshi River |
Height | 22 m |
Length | 60 m |
Power station | |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Type | Underground 142 m long hall |
Hydraulic head | 822 m |
Turbines | 6×Pelton wheels |
Installed capacity | 456 MW @ maximum flow 66m3/s |
Annual generation | 2,281 GWh[1] |
Website tamakoshihydro |
The Upper Tamakoshi Hydroelectric Project is a 456 MW run-of-river hydroelectric project in Nepal. It the largest hydroelectric project in Nepal, and is slated for completion in 2016.[2] It is sited on the Tamakoshi River (also spelled Tamba Koshi), a tributary of the Sun Kosi river (also spelled Sunkoshi), near the Nepal–Tibet border.
The Upper Tamakoshi Hydroelectric Project is a Nepal national priority project. When it is completed, it is projected be the largest hydroelectric plant in Nepal, with a power output equivalent to two-thirds of Nepal's current power generation.[2][3] The Project is entirely financed from domestic financial institutions and companies.
Contents
Financing and organization
Lua error in package.lua at line 80: module 'strict' not found. Nepal Electricity Authority (NEA) has established an autonomous company named Upper Tamakoshi Hydropower Limited (UTKHPL) in March 2007 (2063/11/25 B.S.) as an executing agency for the implementation of the Project. There are six full time and two invitee members in the Board of Directors (BoD) at present. Out of six full time members, four members from NEA, one from Employees Provident Fund (EPF) and one from Nepal Telecom (NTC) are representing in the BoD. Similarly, representatives of Citizen Investment Trust (CIT) and Rastriya Beema Sansthan (RBS) are also in the BoD as invitee members.
The majority share (51%) of the Company is hold by four public entities, namely, Nepal Electricity Authority (NEA), Nepal Telecom (NTC), Citizen Investment Trust (CIT) and Rastriya Beema Sansthan (RBS). NEA has 41% stake, NTC has 6% and CIT & RBS each has 2% stake in the Company. Similarly, general public and residents of Dolakha District will have 15% and 10% share respectively. The remaining 24% share will be taken over by contributors in Employees Provident Fund (EPF), NEA & Companys staffs and staffs of financial institutions providing loans.
Construction
Construction began in February 2011. Sinohydro is managing construction.[4] The Nepalese Army was mobilized to provide security to the site in 2012, after it was reportedly threatened by vandalism and threats to construction staff and foreign workers.[5] Work was disrupted by the April 2015 Nepal earthquake, after which over 200 Chinese workers were evacuated.[2][6] Work was disrupted throughout the construction project by labor strikes.[7][8] The earthquake also caused damage to roads and bridges and buried the troop barracks at the site.[9]
Infrastructure
Infrastructure for the plant includes a 142 m long, 25 m high underground powerhouse hall near Gongar Khola, with six Pelton wheels; a 22 m high × 60 m wide dam; a 360 m high surge shaft; and a total of 16 km of headrace and tailrace tunnels.[1][2][3] The gross head will be 822 m.[2]
References
- ↑ 1.0 1.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 2.0 2.1 2.2 2.3 2.4 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ 3.0 3.1 Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
- ↑ Lua error in package.lua at line 80: module 'strict' not found.
Further reading
- Lua error in package.lua at line 80: module 'strict' not found.