Construction began November 1934 (1934-11)
Commission date
  • July 1938 (1938-07):
  • 1943 (1943)-1951 (1951)
Owner(s) Hydro Tasmania
Pumped-storage power station
Upper reservoir Lake King William
Upper res. capacity 539,340 ML (19,047×10^6 cu ft)
Penstocks 6
Hydraulic head 287 metres (942 ft)
Generating units
Pump-generators 6
Pumps 2
Power generation
Units operational 3-phase 50 hertz (6,000,000 m), 18.75 MVA synchronous generator
Make and model English Electric
Nameplate capacity 90 MW (120,000 hp)
Capacity factor 0.8
Annual generation 684 GWh (2,460 TJ)
Website
hydro.com.au/energy/our-power-stations/derwent-0/tarraleah-power-station
[1]

The Tarraleah Power Station is a pumped-storage[2]:12 hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is part of the Upper Derwent hydro scheme and is operated by Hydro Tasmania.

History

The Upper River Derwent hydroelectric scheme was developed at a time in 1934 when the former Hydro-Electric Commission had only two working power stations.[2]:1 In 1934 the Derwent Valley Power Development power scheme was approved by the Parliament of Tasmania with the Tarraleah Power Station as the first completed power station of that scheme.[3] Ticklebelly Flat, the nickname for the married quarters at Tarraleah Camp number 2 in the 1930s, is a name for the history of Hydro Tasmania by Heather Fenton, known as Ticklebelly Tales.[4]

Power station

File:CSIRO ScienceImage 2957 Tarraleah Hydroelectric Power Station.jpg
The outdoor switchyard located adjacent to the Tarraleah Power Station.

Part of the Derwent scheme that now comprises eleven hydroelectric power stations, the Tarraleah Power Station is located aboveground on the west bank of the Nive River downstream from the village of Tungatinah and a short distance from the Lyell Highway. The station draws its water from a variety of sources. Water from the concrete arched Clark Dam across the River Derwent that forms Lake King William flows from the lake and also from the Butlers Gorge Power Station around 25 kilometres (16 mi) via the Tarraleah Canals.[5][6][7]

The power station was opened in July 1938[8][9][10][11] and has six Pelton-type turbines, with a generating capacity of 90 megawatts (120,000 hp) of electricity. The station output is fed to the transmission grid via 11 kV metal clad switchgear and two 11 /110 kV 75MVA 3-phase power transformers.[6]

See also

<templatestyles src="Stack/styles.css"/>

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. Lua error in package.lua at line 80: module 'strict' not found.

External links

  • Lua error in package.lua at line 80: module 'strict' not found.


<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>