Kolkata Railway Station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Kolkata Railway Station
কলকাতা
Indian Railway Station
Kolkata Station.JPG
Chitpur station, Kolkata
Location Kolkata, West Bengal
 India
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Elevation 30 ft.
Platforms 5
Construction
Parking Available
Other information
Station code KOAA
Zone(s) Eastern Railways
Division(s) Kolkata
History
Opened 2006
Services
Preceding station   Indian Railway   Following station
Eastern Railway zone
Location of Chitpur Railway Station

Kolkata Railway Station (Bengali: কলকাতা রেলওয়ে ষ্টেশন) formerly known as Chitpur Station, is the newest of the four intracity railway stations serving Howrah and Kolkata, India; the others are Sealdah Station, in Kolkata, Shalimar Station in Howrah and Howrah Station in Howrah. Kolkata station is situated in the Chitpur locality of north central Kolkata.

History

The place where the station is situated was formerly a large goods yard. The present car and bus parking areas, as well as the path to the station, formed part of a coal loading yard. The present-day platforms were once used as goods lines and formed part of the large Chitpur Rail Yard.

In 2000, the first plans were made to utilise this area as a railway station, since the rapid growth of long distance passengers was overcrowding the Sealdah station. Due to limitations of space, new platform construction is restricted at Sealdah. Two new platforms (9A & 9B) constructed between 2004 and 2005 proved insufficient. Due to its central position in Kolkata, the Sealdah station is too busy for suburban train traffic. To overcome this problem, Eastern Railways suggested constructing another large railway station in Kolkata, to cater mostly to long distance trains.The decision to build a terminal at Chitpur came after a lot of deliberation and a process of elimination. Different locations were suggested for the station site. Three years ago, Majerhat was suggested as a possible location. The idea was shelved owing to technical difficulties involving the construction of a bridge over the Hooghly river from Bauria to Budge Budge. Then there was Shalimar, in Howrah district, which was already a goods terminal operating under the South Eastern Railway. In fact, a passenger service on a trial basis was also started from there through two pairs of trains. But the project could not take off owing to certain problems relating to infrastructure and the considerable distance of the terminal from Kolkata proper.Chitpur was decided upon finally and approved by the Railway Ministry in 2003-04. Certain inherent advantages helped in the selection of this place. Other than being located in the heart of Kolkata, Chitpur has already functioned as an important rail yard for around a century. Moreover, unlike in the case of Majerhat and Shalimar, the huge property in and around the place belongs to the Railways. The proposal has been accepted by the Kolkata Metropolitan Development Authority (KMDA), and on 15 May 2003, West Bengal Chief Minister Buddhadeb Bhattacharjee laid the foundation stone for the project.

Construction started in 2004. The tracks from the coal-yard were closed first, and then a large portion of electrified goods tracks were shut down. Those tracks, masts and wires were demolished. Next, the Dumdum - Majherhat link rail line's (Kolkata Circular Railway) track was temporarily re-aligned. This action permitted the construction of platforms, station buildings and a parking area to begin. After construction was completed, the circular rail tracks were aligned as before, now via the new station. Other tracks were re-aligned, and completely electrified for passenger coaches shunting (up to side of Tala station). Tracks in the opposite direction, which were not electrified and underutilized, were re-laid, re-aligned and fully electrified for goods trains (with wagon to lorry transfer facility). Part of the former electrified goods lines, which were closed, now entered use as a coach siding.

After these, the official inauguration occurred in January 2006.

Services

The station is linked to the Sealdah-Ranaghat Line and is served by the Eastern Railway for trains to Naihati, Bandel, Kalyani Simanta, Gede, Shantipur, Krishnanagar,Berhampore,Lalgola, Dankuni, Kolkata Airport, Bongaon, Hasnabad and others. The number of suburban trains is lower than long-distance trains. This station runs many long distance express trains including two pairs of Garibrath Express, and one long distance passenger train - Lalgola Passenger. There are five platforms, among them Platform 1 & 2 is used by only suburban trains, and Platform 3,4 & 5 are used by long-distance trains. The station is operated by the Eastern Railway. The only international train of eastern India is Kolkata - Dhaka Maitree Express, which runs towards Bangladesh, is also departed from here. When Howrah & Sealdah are overutilised, this railway terminal is underutilized, so more express trains must be immediately shifted from Sealdah & Howrah to Kolkata Railway Terminal.

The Maharaja Express departed from this station for the first time at 20 March 2010.

Trains originating from Kolkata station

Panorama of the Kolkata Station at Night.

Bus routes

KB Series of Routes

K Series of Routes

  • K1 Kolkata Railway Station – New Town

JM SeriesBus Routes

  • 007 Kolkata Railway Station – Garia Bus Stand
  • JM2 Kolkata Railway Station – Malancha

Mini Bus Routes

STA Bus Routes

Bus Routes without Numbers

  • New Garia Station – Kolkata Railway Station
  • Kolkata Railway Station – Chakla
  • Kolkata Railway Station – Baidyabati Station
  • Kolkata Railway Station – Bagnan
  • Kolkata Railway Station - Alampur
  • Kolkata Railway Station - Ghatal (AC / Non AC)
  • Kolkata Railway Station - Chandrakona Road

WBSTC Franchisee Bus Routes

  • Kolkata Railway Station – Sonarpur Station

CSTC Bus Routes

Criticism

As a newer railway station, this station is not well served by public transport. Only two or three of the West Bengal Surface Transport Corporation's bus routes serve the station directly. Other buses and trams run through Radha Gobinda Kar Road, which is 1 km away from the station. The nearest metro station is 2 km away.

There is a plan to transfer the long distance bus terminus of Shyambazar from the other side of the canal to the front of the station, but nothing has yet materialized. However, there is a bus service from Kolkata station up to Sonarpur station which plies via Shyambazar, Ultadanga, Em bypass, Ajoy Nagar and Garia up to Sonarpur. Travel takes 1hr30mins from Sonarpur station to Kolkata station. One can also take an auto-rickshaw from Ultadanga to Kolkata station.

See also

References

Preceding station   Indian Railway   Following station
Eastern Railway zone

External links