Ghazi-Barotha Hydropower Project

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Ghazi-Barotha Hydropower Project
File:Ghazi Brotha Canal.jpg
The Ghazi-Barotha Canal
Official name غازى بروتھا
Country Pakistan
Location Attock, Attock District, Punjab
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Construction began 1995
Opening date 2002
Construction cost US$ 2.1 billion
Owner(s) WAPDA
Dam and spillways
Impounds Indus River
Spillway capacity 18,700 m3/s (660,000 cu ft/s)
Reservoir
Active capacity 25,500,000 m3 (20,700 acre·ft)
Power station
Commission date 2003-2004
Type Run-of-the-river
Hydraulic head 69 m (226 ft)
Turbines 5 × 290 MW Francis-type
Installed capacity 1,450 MW
Annual generation 7.037 billion units (7037 million GWh)

Ghazi-Barotha Hydropower Project (Urdu: غازى بروتھا‎) is a 1,450 MW run-of-the-river hydropower connected to the Indus River about 10 km (6.2 mi) west of Attock in Punjab, Pakistan. Construction on the project began in 1995 and the first two 290 MW generators were commissioned on 19 February 2003, the same day it was inaugurated by President Pervez Musharraf. The last generator was commissioned in April 2004 and the project was completed by that December. It cost US$2.1 billion with funding from Pakistan's Water and Power Development Authority (WAPDA), the World Bank, Asian Development Bank, Japan Bank for International Cooperation, Kreditanstalt für Wiederaufbau, European Investment Bank and Islamic Development Bank.[1][2]

About 1,600 cubic meter per second of water is diverted from the Indus River near the town of Ghazi about 7 km downstream of Tarbela Dam (3,478 MW). It then runs through a 100 metre wide and 9 metre deep open power channel down to the village of Barotha where the power complex is located. In the reach from Ghazi to Barotha, the Indus River inclines by 76 meters over a distance of 63 km. After passing through the powerhouse, the water is returned to the Indus. In addition to these main works, transmission lines stretch 340 km.

The World Bank classed it "A" for adequate attention to environmental and social issues. The feasibility report was prepared in 1993 during the first tenure of Benazir Bhutto's administration and the Government of Pakistan entered into an agreement for the financing and construction of the project on 7 March 1996.[3]

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.

External links