Antelope Valley Solar Ranch

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Antelope Valley Solar Ranch
Antelope Valley Solar Ranch is located in California
Antelope Valley Solar Ranch
Location of the Antelope Valley Solar Ranch in California
Country United States
Location Antelope Valley, California
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Status Operational
Construction began August 2011
Construction cost $1.36 billion[1]
Owner(s) Exelon
Solar field
Type Flat-panel PV
Site area 2,100 acres (8.50 km2)
Power generation
Units operational 3,800,000
Nameplate capacity 150 MWAC[2]
Max: 266 MW, 230 MWAC[3]
Annual generation 623 GWh

The Antelope Valley Solar Ranch 1 (AVSR1) is a 266-megawatt (MW) photovoltaic power plant near Lancaster within Antelope Valley, in the western Mojave Desert, Southern California. The project was developed by First Solar and later bought by Exelon Corporation in 2011. Full operation was planned for late 2014.[2][4]

In September 2011, the U.S. Department of Energy issued a $646 million loan guarantee to support the project's construction.[5] This loan guarantee was part of the American Recovery and Reinvestment Act of 2009.[6] The project is expected to create 350 construction jobs and 20 permanent jobs.[5]

On February 20, 2013, the first 100 MWAC came online.[7] The plant will use approximately 3.8 million solar panels,[4] about 20% of which will be mounted on single-axis tracking racks.[5] When fully operational, the plant is expected to generate enough energy for 75,000 homes, displacing 140,000 tons of CO2.[7] The power generated by AVSR1 is being purchased by Pacific Gas and Electric Company (PG&E) under a 25-year Power Purchase Agreement.[5][7]

Production

Generation (MWh) of Antelope Valley Solar Ranch One [8]
Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2014 60,933 56,929 52,593 42,933 30,309 243,697
2015 37,018 44,005 64,695 58,280 62,283 57,808 61,724 61,790 53,927 47,614 43,426 36,838 629,408
2016 32,935 32,935
Total 906,040

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 GreenTechMedia.com, Herman K. Trabish, First Solar Cleared to Resume Construction in Antelope Valley, 19 May 2013
  3. GreenTechMedia.com, Herman K. Trabish, Antelope Valley Solar Ranch One: The Solar Power Plant That Could, 5 March 2012
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 5.3 Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.
  7. 7.0 7.1 7.2 Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.