Andong Dam
From Infogalactic: the planetary knowledge core
Andong Dam | |
---|---|
File:Korea-Andong-Nakdong River-03.jpg
View from downstream
|
|
Location of Andong Dam in South Korea
|
|
Country | South Korea |
Location | Andong |
Coordinates | Lua error in package.lua at line 80: module 'strict' not found. |
Status | Operational |
Construction began | 1971 |
Opening date | 1976 |
Owner(s) | Korea Water Resources Corporation |
Dam and spillways | |
Type of dam | Embankment, rock-fill |
Impounds | Nakdong River |
Height | 83 m (272 ft) |
Length | 612 m (2,008 ft) |
Width (crest) | 8 m (26 ft) |
Width (base) | 200 m (656 ft) |
Reservoir | |
Total capacity | 1,248,000,000 m3 (1,011,770 acre·ft) |
Active capacity | 1,000,000,000 m3 (810,713 acre·ft) |
Surface area | 60 km2 (23 sq mi) |
Power station | |
Commission date | 1976 |
Turbines | 2 x 40 MW reversible |
Installed capacity | 80 MW[1] |
The Andong Dam is an embankment dam on the Nakdong River, 4 km (2 mi) east of Andong in Gyeongsangbuk-do province, South Korea. The purpose of the dam is flood control, water supply and hydroelectric power generation. Construction on the dam began in 1971 and was complete in 1976. The 83 m (272 ft) tall rock-fill, central clay core dam withholds a reservoir of 1,248,000,000 m3 (1,011,770 acre·ft) and provides water to an 80 MW pumped-storage power station. The lower reservoir (afterbay) for the power station is created by a 20 m (66 ft) high and 238 m (781 ft) long weir.[2][3]
See also
References
![]() |
Wikimedia Commons has media related to Andong Dam. |
Categories:
- Pages with broken file links
- Commons category link is defined as the pagename
- Dams completed in 1976
- Energy infrastructure completed in 1976
- Dams in South Korea
- Hydroelectric power stations in South Korea
- Rock-filled dams
- Andong
- Pumped-storage hydroelectric power stations
- Buildings and structures in North Gyeongsang Province
- Flood control in South Korea