Addison Airport Toll Tunnel

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Addison Airport Toll Tunnel
Addison Airport Toll Tunnel (logo).png
Overview
Official name Addison Airport Toll Tunnel
Other name(s) Addison Airport Tunnel
Location North Dallas and Addison
Route Dallas North Tollway and Interstate 35E
Start Dallas North Tollway
End Interstate 35E
Operation
Work begun September 1997
Opened 1999
Toll US$0.53
Technical
Construction 1997-99
Length 1,600 feet

Lua error in package.lua at line 80: module 'strict' not found.

The Addison Airport Toll Tunnel, also known as the Addison Airport Tunnel and the Addison Toll Tunnel, is part of the North Texas Tollway Authority (NTTA) system and extends Keller Springs Road under the Addison Airport property.

Built for the NTTA, this toll tunnel enables vehicular traffic to travel under rather than around the airport, which expands traffic capacity and eases the notorious congestion of north Dallas and Addison by providing an east–west route between the Dallas North Tollway and Interstate 35E under the Addison Airport runway. It provides motorists a through passage on Keller Springs Road, which once ended on either side of Addison Airport, as an alternate route to the heavily traveled Belt Line Road and Trinity Mills Road.

The lanes of the Addison Airport Toll Tunnel toll plaza are equipped for electronic toll collection via TollTag. Currently, the toll charged on the Addison Airport Toll Tunnel is US$0.53 for all classes of vehicles and TollTag users.

History

West Tunnel Entrance

In September 1997, tunnelling crews started constructing a two-lane vehicular toll tunnel under Addison Airport. Completed in 1999, the tunnel is approximately 1,600 feet (488 m) in length with a total roadway length of 3,700 feet (1,128 m). The NTTA-commissioned project cost nearly $20 million.