Ploiești–Bacău Motorway

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

Lua error in package.lua at line 80: module 'strict' not found.

Ploiești–Albița Motorway
Autostrada Ploiești–Albița
290px
Route information
Maintained by Compania Națională de Autostrăzi și Drumuri Naționale din România
Length: 314 km (195 mi)
(planned length)
Major junctions
From: Ploiești (Junction with A3)
To: Albița (Border with Moldova)
Highway system
Roads in Romania

The Ploiești–Bacău Motorway is a planned motorway in Romania, designed to link Ploiești with the north-eastern part of the country, partly along the Pan-European Corridor IX. Initially it was designed as a 314 km long motorway branching off the A3 motorway and passing through Buzău, Focșani, and Albița, on the border with Republic of Moldova. However, since 2014 plans in favor of a motorway past Focșani were scrapped in favor of a motorway towards Bacău and Suceava termed A7.[1]

The first section, from Ploiești to Focșani (133 km),[2] was proposed for a concession contract for tendering first half of 2013.[3] No contract was signed, and the only section that has been tendered was the Bacău bypass (30.6 km, of which 19.7 km of motorway) in August 2013,[4] but built at only half profile.[4] It was awarded for construction in November 2013,[5] but the results of the tender were contested by some of the participants.[6] Later in 2014, the whole motorway was redesigned as an expressway that would later be expanded to full motorway specifications.

The motorway from Focșani to Albița (155 km)[7] will have a different route number assigned, and April 2014, the section between Focșani and Albița is no longer a priority in the current master plan for the national motorway network.[8]

Gallery

See also

References

  1. http://adevarul.ro/locale/arad/pe-lotul-autostrada-pecica--nadlac-putea-circula-cateva-zile-1_5486c1d3448e03c0fd985a10/index.html
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. http://www.ziaruldebacau.ro/licitatia-pentru-soseaua-de-centura-a-bacaului-a-fost-contestata/
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. http://economie.hotnews.ro/stiri-eurofonduri-16995937-fotogalerie-primele-imagini-masterplanul-pentru-transporturi-autostrazi-vrea-faca-guvernul-ponta-pana-2022.htm

External links

<templatestyles src="Asbox/styles.css"></templatestyles>