Chilime Hydropower Plant

From Infogalactic: the planetary knowledge core
(Redirected from Chilime Dam)
Jump to: navigation, search
Chilime
Chilime Hydropower Plant is located in Nepal
Chilime Hydropower Plant
Location of Chilime in Nepal
Official name Chilime Hydroelectric Plant
Country Nepal
Location Chilime
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Purpose Power
Opening date 2003
Construction cost Rs. 248 crore (approx)
Owner(s) Chilime Hydropower Company Limited
Dam and spillways
Type of dam Gravity, weir
Impounds Chilime River
Height 3.25 m (10.7 ft)
Length 13 m (43 ft)
Reservoir
Creates Chilime Peaking Pond
Total capacity 53,032 m3 (42.994 acre·ft)
Power station
Name Chilime Hydropower Plant
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Operator(s) Chilime Hydropower Company Limited
Commission date 2003
Type Run-of-the-river
Hydraulic head 351.5 m (1,153 ft) (gross)
Turbines 2 x 11.28 MW Pelton-type
Installed capacity 22.1 MW
Annual generation 132.918 GWh
Website
http://www.chilime.com.np

Chilime Hydropower Plant is a run-of-the-river type plant situated in Chilime of Rasuwa district in Nepal, which is 133 km north of Kathmandu. Its headworks are located near Chilime, whereas the underground power plant is located about 4.5 km (2.8 mi) to the southwest in Syafrubesi on the banks of the local Bhotekoshi river. Water from a weir is diverted into a reservoir before it can be used at the power plant. The difference in elevation between the reservoir and power station affords a gross hydraulic head (water drop) of 351.5 m (1,153 ft). The plant has an installed capacity of 22.1 MW. The generated electricity is fed into the national grid via a 38 km 66KV single circuit transmission line. Most of the power house facilities are underground, with the switchyard the only feature that remains on the surface.The plant employs two horizontal axis Pelton turbines each of 11.28 MW.[1]

The plant is operated by Chilime Hydropower Company Limited which is a subsidiary of Nepal Electricity Authority. The plant started its commercial generation from August 2003.[2]

File:Chilime Dam.JPG
Dam of Chilime Hydropower
Switchyard

See also

References

  1. Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  • Lua error in package.lua at line 80: module 'strict' not found.